Nobody Can Say What the Bill Will Be at Twice the Volume

The pattern looks the same at most software companies. Revenue grows 30% a year and the cloud bill grows 45%. Nobody can say why, and nobody can say what the bill will be next year, because finance sees the invoice but not the system, and engineering sees the system but not the invoice.

The instinct is to cut: a cost-reduction project, a FinOps tool, a round of right-sizing. Those help, but they do not answer the question the CEO and the board are asking, which is what the platform will cost at the volume in the plan. Until that question has an answer, every saving is a one-off and the gap reopens.

The first job is a forecast. Here is how to build one that holds.

Step one: find the true run-rate

Start with the whole bill, not just the invoice finance already knows about. In the research for Cloud Economics for Private Equity, reported cloud cost was typically only 50% to 80% of the true run-rate. The gap comes from the same places nearly every time:

  • Accounts outside the main organization: a team's own account, an acquired company's estate, a sandbox on someone's card
  • Marketplace purchases billed through the cloud provider but booked somewhere else
  • Support plans, data transfer, and taxes that are on the invoice but missing from the dashboards
  • Platform services billed separately: observability, CDN, data warehouse, model APIs

You cannot forecast a number you have only half measured.

Step two: pick the unit

A forecast needs a driver. Choose the unit the business plan is written in: customers, active users, transactions, documents processed, gigabytes ingested. Then compute cost per unit for each of the last twelve months.

If cost per unit is flat or falling, the bill is growing because the business is growing, and the conversation is about margin rather than alarm. If cost per unit is rising, something in the platform scales worse than the business does, and the next step will show you where.

Step three: split the bill by how it scales

Every line on the bill behaves in one of four ways as volume grows. Sorting the bill into these four groups is most of the work, and it is the most useful few hours finance and engineering will spend together this quarter.

Fixed. Costs that do not move with volume: the baseline cluster, shared tooling, the minimum footprint in each region. These shrink per unit as you grow.

Linear. Costs that grow in step with the unit: compute that scales with requests, storage that scales with customers. These hold cost per unit flat.

Step. Costs that jump at a threshold: the database that needs the next instance size, the second region, the support tier that changes at a spend level. These are invisible in a trend line and obvious in a plan.

Faster than linear. Costs that grow faster than the unit. These are the ones that make the bill outrun revenue. Common sources:

  • Data retained rather than data processed: logs, backups, snapshots, and analytics tables that grow with every month of history, not with this month's customers
  • Observability ingestion, which grows with traffic multiplied by the number of services emitting telemetry
  • Data transfer between availability zones and regions as the architecture spreads out
  • Per-tenant resources, in a design that provisions infrastructure for each customer

Step four: model the plan, not the trend

Take the volume in the revenue plan for each of the next four to eight quarters, and run each group forward on its own behavior. Fixed costs stay put. Linear costs scale with the unit. Step costs land in the quarter the threshold is crossed. Faster-than-linear costs follow their own driver, such as months of history retained, or services multiplied by traffic.

A worked illustration, with round numbers that are not drawn from any one company: a platform costs $200,000 a month at 1,000 customers, or $200 per customer. Sorting the bill shows $40,000 fixed, $120,000 linear, and $40,000 in retained data and observability that grows about 6% a month whatever the customer count does. The plan says 1,300 customers in a year, so revenue grows 30%.

  • Fixed: $40,000
  • Linear: $156,000
  • Retained data and observability: about $80,000

That totals about $276,000, up 38% against revenue growth of 30%, and cost per customer rises from $200 to about $213. The faster-than-linear group is a fifth of today's bill and more than half of next year's increase. That is the part to fix first, and the trend line alone would never have shown it.

Then overlay commitments. Savings Plans, reserved capacity, and enterprise agreements lower the rate, but each one is a bet on the future footprint. The forecast tells you how much of that footprint is safe to commit, and how much is not.

Step five: name the decisions that move it

The forecast should end in a short list of decisions, each with an owner and a date. Typically:

  • Retention: how long logs, traces, snapshots, and analytics history are kept, and in which storage tier
  • Architecture: the data paths that cross zones or regions, and the per-tenant resources that could be shared
  • Commitments: how much of the forecast footprint to commit, and for how long
  • Pricing: whether the heaviest customers pay in proportion to what they use

The research behind the book also found that companies capture only about half of identified architectural savings within twelve months. That is not a technical failure. The savings were found; nobody owned them. A forecast without an owner becomes a slide.

Step six: run it every month

Compare the forecast with the actual bill every month, with finance and engineering in the same room. Track cost per unit, the share of the bill in each of the four groups, and commitment coverage. When the variance is explained, the forecast is working. When nobody can explain it, something in the platform changed, and the model needs to change with it.


If nobody owns that number today, that is the seat I take: interim or fractional, two to four days a week, with a forecast at plan volume in the first month. If you would rather start smaller, the two-week diagnostic produces the forecast on its own, and the cloud savings calculator gives a first estimate of the optimization available. Book a free 30-minute call to talk it through.