The Risk Is the Decisions, Not the Tickets
When a head of infrastructure, platform, or AI hands in notice, most companies worry about the work in flight: the migration that is half done, the gap in the on-call rotation. The team usually handles that. Engineers pick up tickets.
What nobody picks up are the decisions. The person who left was the one who knew why the database runs on that instance class, when the compute commitment expires, which vendor contract renews in March, and who to call at the cloud provider when an account is suspended. Those decisions do not appear in a ticket queue. They appear months later, as a renewal nobody reviewed, a bill nobody can explain, or an outage nobody owned.
The search for a replacement will take months. Here is what to do while it runs.
Week one: access, before anything else
If there is a notice period, do this before the last day. If there is not, do it now. Find out who holds the keys. In most companies this was never written down, because the person who just left was the answer.
- The cloud organization's management account and root credentials. On AWS, that is the Organizations management account and the root user of each account. Confirm who holds each MFA device, and move ownership to a company-controlled identity with a written break-glass procedure.
- The billing relationship. Who is the billing contact, who receives the invoices, and who is named on any private pricing agreement or marketplace contract.
- Domains, DNS, and certificates. The registrar login is the one most often tied to a personal email address.
- Identity and on-call. Admin rights in the identity provider, the source control organization, and the paging tool, and the escalation path that used to end at the person who left.
- Vendor accounts. Observability, CDN, data platform, model providers. List each one with the owner of the login and the renewal date of the contract.
Then rotate the credentials the departing leader personally held, on a schedule you control. This is not a judgement about the person. It is the same hygiene you would apply to anyone with that level of access, and it is far easier to do on purpose than to discover later that an old key still works.
Weeks one and two: write down the decisions in flight
Ask the departing leader for a short list, or reconstruct it without them. It needs three columns: the decision, the date by which it has to be made, and what happens by default if nobody makes it. Typical entries:
- Commitments. Savings Plans, reserved capacity, or an enterprise discount agreement, each with an expiry date. Expired coverage quietly moves spend back to on-demand rates. A commitment renewed on autopilot can lock in a footprint that has since changed.
- Architecture decisions that are half made. The database migration that was approved but not started, the second region, the choice of model provider the AI feature will depend on.
- Contracts and renewals. Anything with a notice period that falls inside the next six months.
- Open hiring on the team. Candidates already in process need someone who can assess them.
- Known risks. The single points of failure the leader carried in their head: the scheduled job on one server, the service only they knew how to deploy.
This list is the most valuable thing you can get from a departing leader. It is also the first draft of the job spec for their successor.
Weeks two to four: decide who holds the seat
There are four realistic options, and each has a cost.
The CTO or CEO absorbs it. This is fine for a few weeks at a small company. Beyond that, the platform decisions compete with everything else on their desk, and the default answer becomes "not now."
Promote someone into an acting role. Often this is the strongest engineer on the team. It can work, and sometimes it reveals the permanent hire. The risk is that the best individual contributor stops doing the work only they can do, takes on budget and vendor decisions they have not made before, and the hiring panel then feels obliged to give them the job.
Leave it vacant and run the search. This is the cheapest option on paper. The cost is every decision on the list above that defaults instead of being made, for as long as the search runs.
Bring in an interim leader. Someone who has held this kind of seat, three to five days a week, until the permanent hire starts. Per day, this costs more than a permanent hire. The comparison that matters is with the vacancy: an interim leader is making decisions in the second week, rather than waiting for a hire who arrives months from now and then needs time to learn the platform.
The right choice depends on the list. If nothing on it has a date in the next quarter, an acting lead and a well-run search are usually enough. If commitments expire, an AI launch is planned, or the bill is already growing faster than revenue, those decisions will not wait for the search.
Write the job spec for what the platform needs next
The most common hiring mistake after a departure is a job spec that describes the person who left. Their job was shaped by the platform as it was when they joined.
Write it from the list instead. A company whose next year is about cost control and commitments needs a different leader from one whose next year is about getting an AI feature into production, or one about to move from a single region to several. Decide which of those you are hiring for, then decide the title. Head of infrastructure, head of platform, and head of AI platform are different jobs at most companies, even where the work overlaps.
If an interim leader holds the seat, writing this spec, sitting on the interview panel, and handing over to the person you hire are part of the job. The seat is built to end.
A checklist for the first 30 days
- Management account, root credentials, and MFA devices under company control
- Billing contacts, pricing agreements, and vendor logins listed, each with an owner
- Credentials the leader personally held rotated
- Decisions in flight listed with their dates and defaults
- Commitment and contract expiry dates in a shared calendar
- An owner named for each decision until the seat is filled
- A job spec written from what the platform needs next
- A decision on who holds the seat during the search
If the list has dates on it that will not wait for the search, that is what an interim seat is for: platform, cloud, and AI leadership from the second week until your permanent hire takes over. If you want an outside view of the platform before you decide, the two-week diagnostic produces the decision list and a draft job spec. Book a free 30-minute call to talk it through.